top of page
Writer's pictureNancy Smith

What is IASSC Lean Six Sigma Yellow Belt Certification?

IASSC Lean Six Sigma Yellow Belt questions and exam summary helps you to get focused on the exam. This guide also helps you to be on ICYB exam track to get certified with good score in the final exam.

The IASSC Certified Lean Six Sigma Yellow Belt (ICYB) is a professional who is knowledgeable in the foundational parts of the Lean Six Sigma Methodology, who drives limited growth projects and / or works as a team member as a part of more complicated improvement projects begin by a Certified Green Belt or Certified Black Belt, generally in a part-time role.

IASSC Lean Six Sigma Yellow Belt (ICYB) Certification Summary

IASSC Lean Six Sigma Yellow Belt (ICYB) Certification Exam Syllabus


1. Define Phase

The Basics of Six Sigma

  • Meanings of Six Sigma

  • General History of Six Sigma & Continuous Improvement

  • Deliverables of a Lean Six Sigma Project

  • The Problem Solving Strategy Y = f(x)

  • Voice of the Customer, Business and Employee

  • Six Sigma Roles & Responsibilities

The Fundamentals of Six Sigma

  • Defining a Process

  • Critical to Quality Characteristics (CTQ’s)

  • Cost of Poor Quality (COPQ)

  • Pareto Analysis (80:20 rule)

  • Basic Six Sigma Metrics

  1. including DPU, DPMO, FTY, RTY Cycle Time, deriving these metrics

Selecting Lean Six Sigma Projects

  • Building a Business Case & Project Charter

  • Developing Project Metrics

  • Financial Evaluation & Benefits Capture

The Lean Enterprise

  • Understanding Lean

  • The History of Lean

  • Lean & Six Sigma

  • The Seven Elements of Waste

  1. Overproduction, Correction, Inventory, Motion, Overprocessing, Conveyance, Waiting.

  • 5S

  1. Straighten, Shine, Standardize, Self-Discipline, Sort

2. Measure Phase

Process Definition

  • Cause & Effect / Fishbone Diagrams

  • Process Mapping, SIPOC, Value Stream Map

  • X-Y Diagram

  • Failure Modes & Effects Analysis (FMEA)

Six Sigma Statistics

  • Basic Statistics

  • Descriptive Statistics

  • Normal Distributions & Normality

  • Graphical Analysis

Measurement System Analysis

  • Precision & Accuracy

  • Bias, Linearity & Stability

  • Gage Repeatability & Reproducibility

  • Variable & Attribute MSA

Process Capability

  • Capability Analysis

  • Concept of Stability

  • Attribute & Discrete Capability

  • Monitoring Techniques

3. Control Phase

Lean Controls

  • Control Methods for 5S

  • Kanban

  • Poka-Yoke (Mistake Proofing)

Six Sigma Control Plans

  • Cost Benefit Analysis

  • Elements of the Control Plan

  • Elements of the Response Plan

IASSC Lean Six Sigma Yellow Belt (ICYB) Certification Questions


IASSC Lean Six Sigma Yellow Belt Sample Questions:


Que.:01. As we begin to describe the things occurring with our process through a Process Map we begin to see some steps that are NVA which stands for ____________.


Options:

a) Non-value add

b) No violation allowed

c) Non-value actions

d) Next vehicle action


Que.:02. 5S Sorting: Items used weekly should be kept _______?


Options:

a) In a remote location

b) In a local location

c) Within arm's reach

d) In a storage area


Que.:03. During the Process Discovery activity of the Measure Phase our team uses a ___________________ to brainstorm concerning all the potential things that could impact the output of the process we are investigating.


Options:

a) Pareto Chart

b) Shewhart Analytical

c) Fishbone Diagram

d) None


Que.:04. In the expression Y = f(Xn) Y, the output, is the ___________ variable and Xn, the inputs, are the __________ variables.


Options:

a) Independent, dependent

b) Individual, multiple

c) Sole, multiple

d) Dependent, independent


Que.:05. Which of the following would likely be a CTQ (Critical-to-Quality) for the purchase of a service?


Options:

a) Documentation is clear

b) Was timely in delivery

c) Required no redo

d) All of these answers are correct


Que.:06. As a standard for a process to be at the 6 Sigma quality level, it must have?


Options:

a) Cp & Cpk > 1.5

b) Cp & Cpk >2

c) Cp >1.5 & Cpk >2.0

d) Cp >2.0 & Cpk >1.5


Que.:07. A concept that addresses the consistency of process workers is called ________?


Options:

a) Supervising

b) Visual Factory

c) Standard Operating Procedures

d) Performance Drivers


Que.:08. A key metric in Six Sigma is the DPMO which stands for __________________?


Options:

a) Delayed production metrics output

b) Defects by management oversight

c) Defects per million opportunities

d) Developed production management oversight


Que.:09. The DMAIC approach to problem solving stands for Define, __________, Analyze, Improve and Control.


Options:

a) Manage

b) Measure

c) Memorize

d) Manipulate


Que.:10. As a Belt completes a LSS project she creates for the Process Owner a Control Plan. The Control Plan is to remain active and open for __________________.


Options:

a) One year

b) The rest of the fiscal year

c) The life of the process

d) Three years



Answers:


Question: 01 Answer: a

Question: 02 Answer: b

Question: 03 Answer: c

Question: 04 Answer: d

Question: 05 Answer: d

Question: 06 Answer: d

Question: 07 Answer: c

Question: 08 Answer: c

Question: 09 Answer: b

Question: 10 Answer: c



How to Register for IASSC Certified Lean Six Sigma Yellow Belt Exam?


Exam Registration:

67 views0 comments

Comments


bottom of page